Delta · Drives
Delta VFD-MS300 2.2 kW
3-ph 380–480 V, sensorless vector, built-in PLC
Lead time · Ex-stock Ipoh
Sheet 01 — Capability index
Controls, power, material handling, networking and fabrication — engineered, supplied and serviced from one workshop in Ipoh.
Request a quoteRetrofit, recovery and new logic on Omron, Mitsubishi, Siemens.
MCC rebuilds, VSD retrofit, as-built drawings on handover.
Gravity and driven rollers, measured and fitted on site.
Managed switches, fibre, plant / office segmentation.
IP65 panel PCs and SCADA workstations.
Guards, brackets, enclosures in MS, SS316, aluminium.
New programs, retrofits and recovery of undocumented logic — with a commented printout handed over.
MCC and control panel rebuilds: new breakers, contactors, VSDs, labelling and as-built drawings.
Gravity and driven rollers, drum motors, frames and belt changes — measured on site, fitted on site.
Managed and unmanaged switches, fibre runs, VLAN segmentation between office and plant floor.
Panel PCs, fanless boxes, SCADA workstations and the display hardware they sit behind.
Breakdown attendance, planned maintenance visits and standby cover through shutdowns.
Brackets, guards, enclosures, platforms and machine bases — cut, welded and finished in-house.
Lines we supply and support
Delta · Drives
Delta VFD-MS300 2.2 kW
3-ph 380–480 V, sensorless vector, built-in PLC
Lead time · Ex-stock Ipoh
Omron · PLC & controls
Omron CP2E-N60DT-D
60 I/O compact CPU, transistor out, 24 VDC, Ethernet
Lead time · Ex-stock Ipoh
Moxa · Networking
Moxa EDS-208A
8-port unmanaged, DIN rail, -10…60 °C, 24 VDC
Lead time · 2 weeks
Glove manufacturer, Kamunting
Result
Grade changeover cut from 40 min to 12 min; unplanned stops down 60% over six months.
They took over a line nobody had documentation for and handed us back a commented program. That has saved us more than the job cost.
Maintenance Manager
Glove manufacturer, Kamunting
The panel arrived tested. Cut-over finished inside the shutdown window, which almost never happens with the contractors we have used.
Plant Engineer
Palm kernel mill, Manjung
We call at 2 a.m. and someone answers. The fault report the next morning tells us what actually happened, not just what was replaced.
Production Supervisor
Food processing, Kuala Kangsar
Ambient temperature, blocked filters, DC bus ripple and cable length. A field checklist before you condemn the drive.
Unmanaged is fine for a machine cabinet. The moment control traffic shares a wire with office traffic, you need VLANs.
I/O count, motion needs, spares availability in Perak, and what your technicians already know how to fault-find.
CIDB
Gred G3
⚠ PLACEHOLDER — Categories B04 · E02, electrical works and mechanical installation. Confirm real grade & categories before launch.
ST
Suruhanjaya Tenaga
⚠ PLACEHOLDER — Registered electrical contractor · Chargeman A0 / A4 on staff. Confirm contractor number & competencies.
SSM
Sdn Bhd registration
⚠ PLACEHOLDER — Company no. and SST registration to be confirmed before launch.
MOF
Kementerian Kewangan
⚠ PLACEHOLDER — ePerolehan registration and code to be confirmed before launch.
DOSH
JKKP compliance
⚠ PLACEHOLDER — Registered for hot work, confined space and working at height. Confirm before launch.
ISO
ISO 9001:2015
⚠ PLACEHOLDER — Quality management system, certification in progress 2026. Confirm before launch.
Call the breakdown line for immediate attendance, or send a scoped enquiry and we come back within one working day.