Sheet 08 — Reviews
What plants say
Collected after handover and quoted with permission. Names are withheld on request — the plant and the job type are real.
92%
Repeat clients
4 h
Average attendance, Kinta
210+
Jobs closed since 2016
11
Plants on service contract
PLC retrofit
They took over a line nobody had documentation for and handed us back a commented program. That has saved us more than the job cost.
Maintenance Manager
Glove manufacturer, Kamunting
Panel upgrade
The panel arrived tested. Cut-over finished inside the shutdown window, which almost never happens with the contractors we have used.
Plant Engineer
Palm kernel mill, Manjung
Service contract
We call at 2 a.m. and someone answers. The fault report the next morning tells us what actually happened, not just what was replaced.
Production Supervisor
Food processing, Kuala Kangsar
Conveyor supply
Rollers were measured, cut and fitted in one visit. No second trip, no wrong shaft type.
Warehouse Manager
Logistics DC, Ipoh